• RU
  • icon Waiting For Moderation: 6
Menu

Reconstruction of the existing building with the addition of the meggy drying shop - AR, KM

  • Added: 14.08.2014
  • Size: 9 MB
  • Downloads: 0
Find out how to download this material

Description

The project provides for the reconstruction of the existing building with the addition of a pulp drying workshop to it. The layout decides to place the meggy drying section, corridor and boiler room in the attached part of the building, and the location of the meggy mixing section in the reconstructed part of the existing building.

Project's Content

icon
icon
icon АР.dwg
icon Балка Б1 на снег и утеплит.docx
icon Балка Б2.docx
icon КМ-1-общие данные.dwg
icon КМ-2-5.dwg
icon КМ-первоначально.dwg
icon КМл.10.dwg
icon КМл.11.DWG
icon КМл.12.dwg
icon КМл.13.dwg
icon КМл.6.dwg
icon КМл.7.dwg
icon КМл.8.dwg
icon КМл.9.dwg
icon РАСЧЕТ СТОЙКИ СТ1.rtf

Additional information

Drawings content

icon КМ-1-общие данные.dwg

КМ-1-общие данные.dwg

icon КМ-первоначально.dwg

КМ-первоначально.dwg

icon КМл.10.dwg

КМл.10.dwg

icon КМл.11.DWG

КМл.11.DWG

icon КМл.12.dwg

КМл.12.dwg

icon КМл.13.dwg

КМл.13.dwg

icon КМл.6.dwg

КМл.6.dwg

icon КМл.7.dwg

КМл.7.dwg

icon КМл.8.dwg

КМл.8.dwg

icon КМл.9.dwg

КМл.9.dwg
up Up