Reconstruction of GTPP 20 MW. Development of technical measures for the operation of power transformers TDTN
- Added: 31.05.2022
- Size: 16 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The task of this diploma project is to design the electrical part of the GTPP-20 MW on the basis of the existing substation 110/35/6 T-1. The diploma project consists of two sections. In the first section, it is necessary to design the main electrical circuit. In the second section, it is necessary to develop technical measures for the operation of TDTN power transformers.
Project's Content
|
|
|
1-сХЕМА главная(элемент).vsd
|
2-й Разрез ячейки линии.vsd
|
3-й Разрез ячейки трансформатора.vsd
|
4-Релейная защита трёхобмоточного трансформатора.jpg
|
4-Релейная защита трёхобмоточного трансформатора.vsd
|
5-Габаритный чертеж ТДТН.jpg
|
5-Габаритный чертеж ТДТН.vsd
|
6-суушка.vsd
|
7-схема испытания.vsd
|
|
1-сХЕМА главная(элемент).jpg
|
2-й Разрез ячейки линии.jpg
|
3-й Разрез ячейки трансформатора.jpg
|
4-Релейная защита трёхобмоточного трансформатора.jpg
|
5-Габаритный чертеж ТДТН.jpg
|
6-суушка.jpg
|
7-схема испытания.jpg
|
начало.pdf
|
ПЗ3 - копия.pdf
|
Visio-5-Габаритный чертеж ТДТН.pdf
|
начало.docx
|
ПЗ3 - копия.docx
|
Similar materials
- 25.01.2023
- 26.01.2021
- 25.01.2023
Free downloading for today
Update after: 17 hours 52 minutes