• RU
  • icon Waiting For Moderation: 0
Menu

Reconstruction of GTPP 20 MW. Development of technical measures for the operation of power transformers TDTN

  • Added: 31.05.2022
  • Size: 16 MB
  • Downloads: 1
Find out how to download this material

Description

The task of this diploma project is to design the electrical part of the GTPP-20 MW on the basis of the existing substation 110/35/6 T-1. The diploma project consists of two sections. In the first section, it is necessary to design the main electrical circuit. In the second section, it is necessary to develop technical measures for the operation of TDTN power transformers.

Project's Content

icon
icon
icon
icon 1-сХЕМА главная(элемент).vsd
icon 2-й Разрез ячейки линии.vsd
icon 3-й Разрез ячейки трансформатора.vsd
icon 4-Релейная защита трёхобмоточного трансформатора.jpg
icon 4-Релейная защита трёхобмоточного трансформатора.vsd
icon 5-Габаритный чертеж ТДТН.jpg
icon 5-Габаритный чертеж ТДТН.vsd
icon 6-суушка.vsd
icon 7-схема испытания.vsd
icon
icon 1-сХЕМА главная(элемент).jpg
icon 2-й Разрез ячейки линии.jpg
icon 3-й Разрез ячейки трансформатора.jpg
icon 4-Релейная защита трёхобмоточного трансформатора.jpg
icon 5-Габаритный чертеж ТДТН.jpg
icon 6-суушка.jpg
icon 7-схема испытания.jpg
icon начало.pdf
icon ПЗ3 - копия.pdf
icon Visio-5-Габаритный чертеж ТДТН.pdf
icon начало.docx
icon ПЗ3 - копия.docx
up Up