Reconstruction of FRG reduction line
- Added: 09.08.2014
- Size: 5 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
GENERAL DATA 1. The reconstruction project with replacement of the process equipment GRP-3A was developed according to the technical specification in accordance with MSN 4.03-01-2003 Gas distribution systems.
Project's Content
|
|
ГРП реконструкция.bak
|
ГРП реконструкция.dwg
|
Additional information
Drawings content
ГРП реконструкция.dwg
Similar materials
- 18.05.2023
Free downloading for today
Update after: 8 hours 57 minutes