• RU
  • icon Waiting For Moderation: 16
Menu

Reconstruction of boiler house No. 25. Knot - Thermal and Mechanical Part

  • Added: 29.07.2014
  • Size: 1001 KB
  • Downloads: 0
Find out how to download this material

Description

The diploma project on 11 sheets of graphic material is a 4.5 MW water heating boiler house, with a Ziosab 2000 boiler, a gas economy system, a heat supply system of the city microdistrict, a piezometric graphic drawing: - a heat scheme, equipment layout, a boiler room section, boiler room axonometry, a boiler room gas duct, a boiler room gas supply, a water treatment scheme, a schedule of the network, an automatic design, a calculation diagram of the boiler room. PP: determination of load, boiler calibration calculation, boiler thermal calculation, gadrulic calculation of heat network, construction of piezometric graph, furnace calculation, gas duct calculation, boiler aerodynamic calculation, water treatment calculation, hydraulic calculation of boiler room gas supply

Project's Content

icon
icon
icon poyasnitelnaya_zapiska.doc
icon чертежи.dwg
icon opis.txt

Additional information

Drawings content

icon чертежи.dwg

чертежи.dwg
up Up