Rearranged bunker

- Added: 06.07.2020
- Size: 91 KB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Drawing of technical requirements for design of rearranged hopper loaded by bucket forklift truck. 1. The hopper is designed to transfer the load from the bucket loader to the conveyor of the mobile LPC. 2. Geometrical capacity 3.4 m.kub. 3. Hopper loading - by bucket, unloading - by gravity through hole 0, 4x0.7 m. 4 Bunker welded, metal, rearranged .
Project's Content
![]() ![]() ![]() ![]() |
Additional information
Drawings content
voronka_bunker.dwg

Similar materials
Free downloading for today
Update after: 17 hours 33 minutes