Exchange rate project of the industrial building
- Added: 05.04.2019
- Size: 728 KB
- Downloads: 1
Description
The course design is the job of designing the foundry. The construction site is Arkhangelsk. The terrain allotted for development is mainly flat. The soil consists of the following layers: vegetation layer - 0.4 m, clay - 0.5 m, medium-sized sand - 2.8 m, dense sand - 5.8 m. The workshop relates to the first degree of fire resistance and durability. The workshop is designed for manufacturing of process units and automotive industry units. From the warehouse, the blanks go to the machining compartment, and then part - to the special treatment and painting compartment, where excessive steam and heat emissions are possible. From these compartments, the units come to the assembly compartment - the test compartment, from where the finished products are exported. Basic design data: 1. Length - 96m. 2. Span dimensions - L1 = 18m, L2 = 24m 3. Height of bearing structures - H1 = 7, 2m, H2 = 7, 2m. 4. Lifting capacity of cranes - Q1 = 5t, Q2 = 10t. 5. The pitch of the columns of the inner rows is 12 m. 6. The pitch of the columns of the outer rows is 6 m. 7. Number of employees· All - 200chel.· In the busiest shift - 100chel.· Women - 30% 8. The number of employees is 20 9. Internal temperature - 16 degrees 10. Relative air humidity - 50% 11. Category of visual work: V
Project's Content
prom-zdanie-katya_recover000.dwg
|
Similar materials
- 04.11.2022
Free downloading for today
- 21.04.2016