Project of production of works on the device of the culvert structure
- Added: 10.04.2023
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Type of construction: construction of a new highway
Road category: III technical category
Number of lanes, pcs.: 4 (4-way)
Height of the embankment in the construction area, m: 1.0 m
Level of the top of the pipe, m: 0.2 m below the ground elevation
Total number of pipes, pcs.: 2 single-point pipes
Pipe diameter: 2.0 m
Distance between pipes: 200 m
Construction region: Ryazan region, Alexander Nevsky district
Type of watercourse crossed: stream
Project's Content
Курсовая.dwg
|
Курсовая-Лист2.pdf
|
Курсовая-Лист3.pdf
|
Курсовая-Лист1.pdf
|
ППР_Кузьмина.docx
|
Курсовая.dwg
|