• RU
  • icon Waiting For Moderation: 10
Menu

Project of production of works on the device of the culvert structure

  • Added: 10.04.2023
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Type of construction: construction of a new highway

Road category: III technical category

Number of lanes, pcs.: 4 (4-way)

Height of the embankment in the construction area, m: 1.0 m

Level of the top of the pipe, m: 0.2 m below the ground elevation

Total number of pipes, pcs.: 2 single-point pipes

Pipe diameter: 2.0 m

Distance between pipes: 200 m

Construction region: Ryazan region, Alexander Nevsky district

Type of watercourse crossed: stream

Project's Content

icon Курсовая.dwg
icon Курсовая-Лист2.pdf
icon Курсовая-Лист3.pdf
icon Курсовая-Лист1.pdf
icon ППР_Кузьмина.docx
icon Курсовая.dwg

Free downloading for today

Update after: 1 hour 9 minutes
up Up