Produced Water Preliminary Discharge Unit (FWDU-1) at the Kalamkas field
- Added: 25.09.2024
- Size: 2 MB
- Downloads: 0
Subscribe to receive an information about new materials:
Description
In the architectural and construction part of the project, buildings and structures of technological installations and buildings for auxiliary and industrial purposes are designed.
Project's Content
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- AutoCAD or DWG TrueView
Similar materials
- 25.10.2022
Free downloading for today
Update after: 11 hours 32 minutes