• RU
  • icon Waiting For Moderation: 0
Menu

Present Process Flow Sheet for Earthworks during Installation of External Gas Pipeline

  • Added: 11.06.2015
  • Size: 442 KB
  • Downloads: 2
Find out how to download this material

Description

The present process plan has been developed for the process of excavation works, which are one of the stages of installation of the gas supply system of a 4-storey 20-apartment building. It consists of the following drawings: - Scheme of soil development by excavator with loading into automatic dump truck; - Scheme of plant layer cutting by bulldozer; - Scheme of calculation of working area width and laying of single pipeline; - Scheme of soil development by excavator; - Scheme of trenchless laying of gas pipeline by means of horizontal drilling. Also listed in the Job Instruction are: - Work Schedule; - Material and Technical Resources; - Technical and Economic Indicators.

Project's Content

icon tk-na-proizvodstvo-zemlyanyh-rabot.cdw

Additional information

Drawings content

icon tk-na-proizvodstvo-zemlyanyh-rabot.cdw

tk-na-proizvodstvo-zemlyanyh-rabot.cdw
up Up