• RU
  • icon Waiting For Moderation: 0
Menu

Present Process Flow Sheet for Earthworks during Installation of External Gas Pipeline

  • Added: 11.06.2015
  • Size: 442 KB
  • Downloads: 2

Description

The present process plan has been developed for the process of excavation works, which are one of the stages of installation of the gas supply system of a 4-storey 20-apartment building. It consists of the following drawings: - Scheme of soil development by excavator with loading into automatic dump truck; - Scheme of plant layer cutting by bulldozer; - Scheme of calculation of working area width and laying of single pipeline; - Scheme of soil development by excavator; - Scheme of trenchless laying of gas pipeline by means of horizontal drilling. Also listed in the Job Instruction are: - Work Schedule; - Material and Technical Resources; - Technical and Economic Indicators.

Project's Content

icon tk-na-proizvodstvo-zemlyanyh-rabot.cdw
The material is a file that can be opened in program:
  • Kompas or KOMPAS-3D Viewer

Additional information

Drawings content

icon tk-na-proizvodstvo-zemlyanyh-rabot.cdw

tk-na-proizvodstvo-zemlyanyh-rabot.cdw
up Up