PPR for the construction of an administrative building
- Added: 05.05.2015
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Typical process flow sheet has been developed for installation of foundation blocks of the administrative building.
Project's Content
avtokad2.dwg
|
Additional information
Drawings content
avtokad2.dwg
Similar materials
- 04.11.2022
- 24.01.2023
- 09.07.2014
- 09.07.2014
- 04.11.2022
- 24.01.2023
Free downloading for today
Update after: 7 hours 58 minutes