• RU
  • icon Waiting For Moderation: 50
Menu

PPR for the construction of an administrative building

  • Added: 05.05.2015
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Typical process flow sheet has been developed for installation of foundation blocks of the administrative building.

Project's Content

icon avtokad2.dwg

Additional information

Drawings content

icon avtokad2.dwg

avtokad2.dwg
up Up