Initial data for the course project:

1. Feed pump Rust 45 kW 2 pcs

2. Rust mains pump 132 kW 2 pcs

3. Condensate feed pump Rust 18.5 kW 2 pcs

4. Smoke exhauster of steam boiler GM Rust 100 kW  1 pc

5. Steam boiler fan GM Rust 65 kW 1 pc

6. Rust overhead crane 11 kW 1 pc

 

Contents of the calculation and explanatory note:

Introduction

1. Characterization and analysis of the main initial data for the design of the power supply system of the boiler house

2. Selection of power electrical equipment according to the specified installed capacity of electrical receivers

3. Selection of starting and protective equipment for electrical receivers. Calculation of branches to electrical receivers

4. Development of a power supply scheme for boiler house electrical receivers and selection of its design

5. Determination of the design electrical loads of the boiler house

6. Selection of network electrical devices and protection devices in them

7. Selection of wire and cable cross-sections for the power network of the boiler house

Conclusion