Overhaul project of the medical center building
- Added: 02.01.2019
- Size: 608 KB
- Downloads: 0
Description
Design documentation of the AR brand for the premises of the 1st floor of the building of MDC-S LLC,. The following works are reflected in this design documentation: - execution of partitions made of gypsum board; - closing of a part of doorways; - replacement of window and door fills; - overhaul of premises combined with a single technological cycle, including execution of new floors, finishing of walls and ceiling. 4. For examination of hidden works according to SNiP 3.01.01-85 make the following acts: - acts for installation of plaster and painting works; - acts for preparation device for floors and arrangement of floors; - acts for installation of door and window blocks. 5. All construction materials and products used in the construction of this facility must undergo radiation control in accordance with the Federal Law "On Radiation Safety" (OSP ORB-99) and SP 2.6.1.799-99. Radiation monitoring shall be carried out during the construction of the premises in ready form. Radiation monitoring results shall be transmitted to the customer and attached to the delivery documentation along with concealed works reports. 6. If new materials, including imported materials, products, structures and technologies are used in the construction of this facility, they must have the appropriate technical certificates. 7. Holes in walls and bulkheads, after installation of communications carefully seal. 8. Internal finishing works shall be performed according to the room finishing list.
Project's Content
ar-2.dwg
|
Additional information
ar-2.dwg
Similar materials
Free downloading for today
- 21.04.2016
Other materials
- 13.05.2023