• RU
  • icon Waiting For Moderation: 11
Menu

Overhaul of the CBL Anti-tuberculosis dispensary of the Kanavinsky district of N.Novgorod at the address: N.Novgorod, st. Vokzalnaya, 18 - electrical equipment and electrical lighting.

  • Added: 29.07.2014
  • Size: 355 KB
  • Downloads: 0
Find out how to download this material

Description

The design provides diagrams and layout of equipment during the reconstruction of the central bacteriological laboratory of the TB dispensary

Project's Content

Name Size
icon elektrosnabzhenija_cbl.rar
355 KB
icon TSBL.dwg
211 KB
icon Floor_1.dwg
134 KB
icon Floor_2.dwg
107 KB
icon Floor_3.dwg
86 KB

Other materials

up Up