• RU
  • icon Waiting For Moderation: 2
Menu

Operation of lifting equipment of the RMC of JSC "Kamenskvolokno"

  • Added: 17.05.2023
  • Size: 693 KB
  • Downloads: 0
Find out how to download this material

Description

Introduction

Chapter 1. Overhead cranes

1.1. Technological process of overhead crane

1.2. Purpose, design, main components and principle of operation of the equipment

1.3. Installation of equipment

 Chapter 2. Working conditions and general technical characteristics of the overhead crane

2.1. Calculation of the load lifting mechanism

2.2. Assessment of safety and working conditions during crane operation

3. Conclusion

4. References

Project's Content

icon Курсовая Просцов 816 1.docx
icon чертеж 2 Просцов.cdw
icon Чертеж Просцов.cdw
up Up