• RU
  • icon Waiting For Moderation: 6
Menu

Mine fragment drawing

  • Added: 15.01.2021
  • Size: 891 KB
  • Downloads: 4
Find out how to download this material

Description

Performing the course work "Drawing a fragment of a mine," it is necessary to independently study some sections. This is significant for the construction of a three-dimensional parametric model of a mine fragment; Run two-dimensional horizon plan drawings on this model determination of metric and positional parameters of specified workings; performance of workings according to the specified parameters; determination of true values of distances between workings; making sections, sections on mountain drawings. In this case, it is necessary to be guided by the main GOST of the Unified System of Design Documentation (ESKD) and Mining and Graphic Documentation (GGD).

Project's Content

icon 9.m3d
icon 10 (1).m3d
icon Gorizont_5.m3d
icon Рудник.cdw

Additional information

Drawings content

icon Рудник.cdw

Рудник.cdw
up Up