• RU
  • icon Waiting For Moderation: 17
Menu

Metal constructions. Work site of an industrial building.

Description

Calculation and design of the working site of an industrial building made of metal structures.

  1. Source data
  • column spacing in the longitudinal direction - L=11.9 m
  • Number of steps in the longitudinal direction - 2
  • Column spacing in the transverse direction - L=7.9 m
  • Number of steps in the transverse direction - 2
  • The elevation of the top of the deck of the platform is DH=+10 m
  • Minimum elevation of the bottom of the beams dBmin=+7.8 m
  • Standard determination of the useful evenly distributed load on the deck q=1.8 t/m2

 

Additional data:

  • Beam and column material: low-carbon steel.
  • Decking composition: monolithic reinforced concrete slab with a thickness of 100 mm, cement-sand screed with a thickness of 25 mm.
  • foundation material: B20 class concrete
  • design operating temperature -45 °C
  • Liability Reliability Factor = 1
  • Variant design - not provided

Project's Content

icon МК_ПЗ.pdf
icon МК_ГЧ.dwg
up Up