Mechanical Section Design
- Added: 11.11.2021
- Size: 682 KB
- Downloads: 0
Description
Introduction
Source Data
Shop Floor Production Program Calculation
Calculation of quantity of main and process equipment
Calculation of Workshop Operating Composition
Calculation of production areas
Calculation of storage areas
Calculation of support offices
Select Production Building Type
Technical and economic indicators of the workshop
Conclusion
List of literature
Project's Content
Механический участок _ Кп.cdw
|
кп.docx
|
Additional information
Contents
Introduction
Source Data
Shop Floor Production Program Calculation
Calculation of quantity of main and process equipment
Calculation of Workshop Operating Composition
Calculation of production areas
Calculation of storage areas
Calculation of support offices
Select Production Building Type
Technical and economic indicators of the workshop
Conclusion
List of literature
Introduction
The purpose of the workshop site design is to establish the technical capabilities and economic indicators of the proposed solution, to choose the best and most economical option and to develop a feasibility study of the advantage of this solution over others. The solution of these issues is not limited to the knowledge of processing methods on various types of machines and requires the study and knowledge of a whole range of issues related to the calculation of capacities, the selection of organizational forms and methods for the execution of the production process, the determination of the working composition, areas and the entire structure of the site and workshop; it is also necessary to take into account the level of development of this industry, the dynamics of productivity meters, new technology and other factors.
Initial data for the design of the shop site are: working drawings of the product and technical specifications for its manufacture, operation mode of the site.
Conclusion
In this course project, based on the task and initial data, the mechanical workshop of the machine-building enterprise was designed, for which the production program was determined, the number of equipment, main and auxiliary production workers, the workshop area and the workshop infrastructure were calculated.
The equipment is arranged according to processing groups of structurally and technologically homogeneous parts.
The organizational structure of the workshop management was also designed,