Machine tool for alignment of "Ramp" part

- Added: 19.12.2016
- Size: 197 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The device is installed by centering with two screwed keys, along the central slot of the machine table. Fastening is performed using two T-bolts.
Project's Content
![]() |
Similar materials
- 10.01.2022
Free downloading for today
Update after: 17 hours 32 minutes