• RU
  • icon Waiting For Moderation: 14
Menu

Instrumentation Air Preparation Unit Module

  • Added: 22.04.2022
  • Size: 4 MB
  • Downloads: 0
Find out how to download this material

Description

The project includes the main set of AOB and the attached documents:

  • General data
  • connection diagram of external wiring of the heating and ventilation system
  • plan of the location of the equipment and external wiring of the heating and ventilation system of the unit-module of air preparation of the instrumentation
  • Hardware Specification
  • statement of scope of work

Project's Content

icon Р2-0034718-АОВ1 лист 3.dwg
icon Р2-0034718-АОВ1.СО.xlsx
icon Р2-0034718-АОВ1.ВР.xlsx
icon Р2-0034718-АОВ1 лист 1.dwg
icon Р2-0034718-АОВ1 лист 2.dwg

Additional information

Drawings content

icon Р2-0034718-АОВ1 лист 3.dwg

icon Р2-0034718-АОВ1 лист 1.dwg

Р2-0034718-АОВ1 лист 1.dwg

icon Р2-0034718-АОВ1 лист 2.dwg

Р2-0034718-АОВ1 лист 2.dwg

Free downloading for today

Update after: 6 hours 38 minutes
up Up