• RU
  • icon Waiting For Moderation: 18
Menu

Institute of Orthodontics and Dental Services of MGMSU, Moscow, Kosoi per., vl.17, p.2. - power supply

  • Added: 09.07.2014
  • Size: 7 MB
  • Downloads: 0
Find out how to download this material

Description

The construction project has been developed in accordance with the current construction, technological, sanitary standards and regulations and provides for measures to ensure the structural reliability, explosion and fire safety of the facility in emergency situations, protection of the natural environment during its operation and meets the requirements of the Urban Planning Code, put into effect 29.12.2004 No. 190-F3.

Project's Content

icon
icon
icon ВРУ1.bak
icon ВРУ1.dwg
icon ВРУ2.bak
icon ВРУ2.dwg
icon
icon A0 LUX.bak
icon A0 LUX.dwg
icon A1 LUX.dwg
icon A2 LUX.dwg
icon A3 LUX.dwg
icon A4 LUX.dwg
icon A5 LUX.dwg
icon A6 LUX.dwg
icon A7 LUX.dwg
icon А+26,4_А+31,4.dwg
icon А-7,5_А-4,35.dwg
icon
icon Общие данные.dwg
icon План электрощитовой.dwg
icon спецификация.dwg
icon Чертеж18.dwl
icon Чертеж18.dwl2
icon
icon 7ЩС-1,2.bak
icon 7ЩС-1,2.dwg
icon 7ЩС-1.bak
icon титульный лист.doc

Additional information

Drawings content

icon ВРУ1.dwg

ВРУ1.dwg

icon ВРУ2.dwg

ВРУ2.dwg

icon A0 LUX.dwg

A0 LUX.dwg

icon A1 LUX.dwg

A1 LUX.dwg

icon A2 LUX.dwg

A2 LUX.dwg

icon A3 LUX.dwg

A3 LUX.dwg

icon A4 LUX.dwg

A4 LUX.dwg

icon A5 LUX.dwg

A5 LUX.dwg

icon A6 LUX.dwg

A6 LUX.dwg

icon A7 LUX.dwg

A7 LUX.dwg

icon А+26,4_А+31,4.dwg

А+26,4_А+31,4.dwg

icon А-7,5_А-4,35.dwg

А-7,5_А-4,35.dwg

icon Общие данные.dwg

Общие данные.dwg

icon План электрощитовой.dwg

План электрощитовой.dwg

icon 7ЩС-1,2.dwg

7ЩС-1,2.dwg
up Up