Heading work: Sewage pump station
- Added: 14.09.2017
- Size: 1015 KB
- Downloads: 7
Description
Coursework: Sewage pumping station Composition of work: - assembly drawing - sheet specification 2 - explanatory note - drawing image (JPG)
Project's Content
|
Специф обор_2.cdw
|
Специф обор_1.bak
|
Канализ нас станц.bak
|
состав описание работы.txt
|
Канализ нас станц.jpg
|
Канализ нас станц.cdw
|
Поясн записка КНС.docx
|
Специф обор_1.cdw
|
Additional information
Contents
Introduction............................................................ 3 1. Selection of pumps
Determination of pump station operation mode
Definition of receiving tank volume
Determination of the diameter of the underground part of the pump station
Calculation of suction pipelines
Calculation of pressure pipelines
Calculation of pressure water ducts
Determination of required pump head
Pump selection
Selection of electric motor
Check of pump impeller turning necessity
Construction of characteristics of joint operation of pumps and water ducts
4.1 Construction of pump collaboration characteristics
4.2 Construction of characteristics of water ducts joint operation
Check of pumps and water ducts in case of accident
Development of the high-altitude diagram of the pump station
6.1 Determination of pump axis elevation
6.2 Determination of the height of the above-ground part of the pump station
6.3. Determination of depth of pressure water ducts
Selection of pump station equipment
Selection of number of standby pumps
Selection of drain pumps
Selection of power transformers
Selection of grates and crushers
Selection of lifting equipment
Determination of head loss value in internal communications of pump station
Determination of economic parameters of the pumping station........... 28 List of literature
Appendix A: KNU Equipment Specification
Introduction
The purpose of this course work is to master the educational material devoted to the discipline "Pumping and blowing stations." During the development of course work, lectures were used, as well as practical exercises, which made it possible to get as close as possible to the design basics of such a large facility as a sewage pumping station (KNU). The main task in the development of this course work was, applying the recommendations of the teaching manual, to learn how to conduct calculations and design the KNS.
Sewage water of settlements is supplied through free gravity pipelines to the main sewage pumping station, from which it is supplied by pumps through pressure water pipelines to the receiving chamber of sewage treatment facilities of the settlement. In order to design the sewage pumping station (CN) it is necessary to perform the following calculations: determine the operating mode of the CN; determine the volume of the receiving tank of this pump station; perform hydraulic calculation of suction and pressure pipelines; determine the required pump head; select the type of pump and motor driving it; determine the number of standby pumps; calculate the turning of the pump impeller; schedule the joint operation of pumps and water pipelines; check pumps and water ducts to pass the emergency flow; determine the number of emergency switches on pressure water ducts; develop a high-altitude scheme of the KNU; select equipment to remove floating waste from the water; select the drain pump; pick up the power transformer; pick up lifting equipment; select shaped parts and fittings; clarify head losses in internal communications of the pump station; determine the main technical and economic parameters of the pump station.
Специф обор_2.cdw
Канализ нас станц.cdw
Специф обор_1.cdw
Similar materials
- 09.07.2014