GSV Administrative Building
- Added: 09.08.2014
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The project Modernization of the heating system with installation of gas boilers in the boiler house of the administrative building was carried out on the basis of technical specifications No. issued.
Project's Content
|
gsv_administrativnogo_zdanija.dwg
|
Additional information
Drawings content
gsv_administrativnogo_zdanija.dwg
Similar materials
- 09.07.2014
- 09.07.2014
Free downloading for today
Update after: 18 hours 21 minutes
- 24.04.2014