Grid for Course Design Plant Process

  • Added: 04.08.2020
  • Size: 784 KB
  • Downloads: 3
Find out how to download this material

Description

The grid of the daily schedule of work of the station for the academic year project "Technological process of work of the local station" in the subject Technology of Transportation Process for specialty the Organization of transportations and management on transport the Local station is 23.02.01 nodal, has 3 adjunctions: two two-acceptable (K-l and L-m) and one single-line (L-N) the Station has 5 ways in the odd priyemo-dispatch park, 4 ways in the even priyemo-dispatch park. The marshalling fleet of the station has 8 tracks, there are also 2 exhaust tracks: for disbanding and forming trains. The station is adjoined by an access road and a freight yard.