• RU
  • icon Waiting For Moderation: 10
Menu

general plan abz

  • Added: 13.10.2020
  • Size: 519 KB
  • Downloads: 5
Find out how to download this material

Description

Course Project for Design of ABZ Production Plant

Project's Content

icon Genplan_Abz.dwg
icon zapiska_1.docx
icon soderzhanie.doc

Additional information

Contents

Contents

Introduction

Define Production Plant and Material Requirements

2. Select Manufacturing Site Location

3. Selection of process equipment

4. Manufacturing Plant Plot Plan Design

4.1 Warehouse Design

4.2 Determination of nomenclature and areas of buildings and structures, their placement

4.3 Process Processes at the Production Facility

Determination of water and electricity demand

Occupational safety

Conclusion

List of sources used

Introduction

Improving the organization of the production base of road construction is one of the most important areas that ensure increased efficiency in the use of high-performance machines.

Asphalt concrete plants (ABZ) are specialized enterprises designed to prepare hot, cold and cast mixtures. In addition, ABZ organizes the production of black gravel, the processing of old asphalt concrete.

The most important choice of plant location is in the design of ABZ. The correct solution of this problem depends on: the cost of the produced mixture, the use of equipment, the period of construction of the road, etc.

When selecting the ABZ location, take into account:

- the need for a mixture ;

- road construction time;

- terrain;

- location of bases and sources of material supply, railway stations, access roads;

- location of industrial and residential facilities;

- possibility of obtaining water and electricity;

- the time of delivery of the mixture from the plant to the road.

Power and auxiliary departments - power plants or transformer substations, compressor and steam-boiler plants, water supply devices, warehouses of various materials, bitumen and oil pipeline systems, a complex of office and auxiliary rooms are included in the distribution ABZ.

The purpose of the course project "Designing the General Plan of the Production Enterprise" is to resolve and consolidate the theoretical knowledge obtained during the study of basic and related disciplines; training in independent work with normative and reference literature; obtaining skills for creative solution of individual engineering problems.

In course work, it is necessary to consider the issues of choosing the location of the production enterprise, technological equipment, compiling technological diagrams, labor protection.

Conclusion

During the course work, an engineering decision was made to select two CA 100U mixing units with a capacity of 78 t/h.

Also, by comparing the options, the optimal location of the ABZ was chosen - on the railway.

The master plan of the production enterprise - an asphalt concrete plant - was designed taking into account the wind rose and observing sanitary standards, fire regulations and labor protection rules.

Drawings content

icon Genplan_Abz.dwg

Genplan_Abz.dwg

Free downloading for today

Update after: 2 hours 55 minutes
up Up