• RU
  • icon Waiting For Moderation: 16
Menu

Drilling and securing mine workings in potassium salt deposits

  • Added: 17.10.2024
  • Size: 707 KB
  • Downloads: 0
Find out how to download this material

Description

Justification and selection of a set of equipment for carrying out workings in the main directions with a length of 7000 m, calculation of parameters for fastening the joint to a technological working, calculation of the productivity of the tunneling and cleaning complex.

The course project contains sections describing the mining and geological conditions of the work site, choosing a method and means of mechanization for driving a given working. . Calculation of fastening parameters, productivity of the tunneling complex, and ventilation parameters of the excavation was carried out. Occupational safety measures were considered.

Project's Content

icon
icon Паспорт крепления.jpg
icon Паспорт крепления.cdw
icon Курсовая.docx
up Up