Drilling and securing mine workings in potassium salt deposits
- Added: 17.10.2024
- Size: 707 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Justification and selection of a set of equipment for carrying out workings in the main directions with a length of 7000 m, calculation of parameters for fastening the joint to a technological working, calculation of the productivity of the tunneling and cleaning complex.
The course project contains sections describing the mining and geological conditions of the work site, choosing a method and means of mechanization for driving a given working. . Calculation of fastening parameters, productivity of the tunneling complex, and ventilation parameters of the excavation was carried out. Occupational safety measures were considered.
Project's Content
|
Паспорт крепления.jpg
|
Паспорт крепления.cdw
|
Курсовая.docx
|
Similar materials
- 13.12.2023
- 24.01.2023
- 09.07.2014
- 24.01.2023
Free downloading for today
Update after: 3 hours 52 minutes