Development of a project for the lining of the collector tunnel D = 5.6 m, being built by TPK Herrenkneht
- Added: 24.01.2023
- Size: 4 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Development of a project for the lining of the collector tunnel D = 5.6 m, being built by TPK Herrenkneht
Project's Content
|
Курсовая работа - Разработка проекта обделки коллекторного тоннеля D=5,6м, сооружаемого ТПК ''Herrenkneht''.pdf
|
МПС - Курсовая работа.dwg
|
Additional information
Drawings content
МПС - Курсовая работа.dwg
Similar materials
- 20.08.2014
- 20.08.2014
- 20.08.2014
- 20.08.2014
Free downloading for today
Update after: 16 hours 13 minutes
- 21.04.2016