• RU
  • icon Waiting For Moderation: 20
Menu

Design of Tower Jib Crane with Slewing Tower and Variable Jib Carriage Movement

  • Added: 05.02.2024
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Content

 

Introduction. 4

1. Description of the device, design features and principle of operation. 5

Description of the design of the KBM-401P tower crane.  9

2. Determination of the main parameters and calculation of the load lifting mechanism. 11

2.1. Selection of the type and multiplicity of the polyspaste. 11

2.2. Calculation of the drum assembly. 13

3. Calculation and selection of electric motor and gearbox. 15

3.1. Electric motor selection. 15

3.2. Gearbox selection. 16

3.3. Checking the heating of the electric motor. 17

3.3.1. RMS moment check. 17

3.4. Selection of couplings. 22

3.5. Brake selection. 23

3.6. Calculation of the mechanism of carriage movement along the boom. 24

3.7. Calculation of motor power and selection of gearbox. 26

4. Safety measures. 27

Conclusion. 30

References. 31

 

Introduction

 

Hoisting machines are a highly effective means of integrated mechanization and automation of lifting and transporting, loading and unloading and warehouse operations. The use of such machines reduces the use of heavy manual operations and contributes to a sharp increase in labor productivity. The automation of hoisting machines makes it possible to include it in the production line, and the versatility of its use makes it an integral element of flexible automated production.

Hoisting machines move piece and bulk cargo along the spatial route, assemble large-block industrial and residential buildings, install and assemble equipment of industrial enterprises, supply various building materials to the place of their laying, carry out loading and unloading operations in warehouses of building materials, service production processes in repair and other workshops. Hoisting machines are machines of intermittent, (cyclical) action. In their work cycle, periods of action are interspersed with pauses.

Such selection of hoisting machine and material handling equipment is the main factor of normal operation and high production efficiency. It is impossible to ensure its stable rhythm at the modern stage of intensification without the coordinated and trouble-free operation of modern means of mechanization of intra- and inter-shop transportation of raw materials, semi-finished products and finished products at all stages of processing and storage.

That is why the purpose of this course work is to calculate and design the KBM-401P tower crane, its main mechanisms and indicators.

Project's Content

icon
icon Задание.docx
icon Лебёдка.cdw
icon Лебёдка.pdf
icon Общий вид.cdw
icon Общий вид.pdf
icon ПЗ.docx
icon Спецификация Башеного крана.docx
icon Спецификация Башеного крана.pdf
icon Спецификация Лебёдка.doc
icon Спецификация Лебёдка.pdf
icon Спецификация Стрела башеного крана.doc
icon Спецификация Стрела башеного крана.pdf
icon Стрела.cdw
icon Стрела.pdf

Free downloading for today

Update after: 15 hours 15 minutes
up Up