Design of the TO-1 zone for a fleet of road construction machines
- Added: 16.04.2024
- Size: 273 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Technological part
A car (in our case, a tractor), having passed the swing gate post, enters the TO-1 section, where the necessary fastening, adjustment, lubrication, refueling and cleaning, electrical work and maintenance of the engine power system are carried out. A limited amount of non-labor-intensive repair work is also carried out at the TO-1 site. The technological process of production is understood as the sequence of technical effects on the car at the motor transport station.
Project's Content
План производственного корпуса (А1)_вар.4.dwg
|
Similar materials
- 25.10.2022
- 25.01.2023
- 09.07.2014
- 09.05.2021
- 25.10.2022
- 25.01.2023
Free downloading for today
Update after: 15 hours 2 minutes