Design of the nipple processing area for submersible pumps
- Added: 29.04.2023
- Size: 5 MB
- Downloads: 1
Description
In this diploma project, an analysis of the existing technology for manufacturing a nipple part for submersible pumps was carried out and a new developed technological process for machining this part on modern equipment was proposed in order to reduce the processing time of the part. Automatic loading and unloading of technological equipment by an industrial robot is also designed. As a device for loading parts, the grip of the robot's arm was calculated.
In the technological part of the project, an analysis of the basic technological process was carried out, calculations were made for the developed technical process for operating allowances, cutting conditions.
In the design part, an automated section of the machine shop for processing the part was developed using an industrial floor-type robot M20P.40-02 and an automated transport trolley.
In the section "Life Safety" considered
safety when using automated equipment, sanitary and hygienic working conditions at the workplace, in addition, the calculation of artificial lighting for the workshop was made.
In the economic part of the project, the indicators of the workshop, the number of workers, the wages of workers, the cost of manufacturing the part are calculated. A comparative analysis of the cost of manufacturing parts according to the basic technological process and the developed one is carried out.
Economic efficiency amounted to 8350136.46 rubles for the annual production program.
The payback period of the main costs is 7 years.
Project's Content
|
|
spetsifikatsia1.doc
|
spetsifikatsia2.doc
|
1_list.cdw
|
|
Образец титульного листа.doc
|
титульник спецификаций.doc
|
Титульный тех процесс.doc
|
|
1 Чертеж детали.bak
|
1 Чертеж детали.cdw
|
10 Экономика А1.cdw
|
11 КИМ.cdw
|
2 Схват.cdw
|
3 Наладка1.cdw
|
4 Наладка2.cdw
|
5 РТК сбоку.cdw
|
6 РТК сверху.cdw
|
7 РТК общий.cdw
|
9 Циклограмма А11.cdw
|
Тележка.cdw
|
8 ЗаготовкаСверлаЭскизы.frw
|
|
Patron_pnevmaticheskii.cdw
|
Stol ST-150.cdw
|
патрон.cdw
|
спецификация.cdw
|
Гидрозащита.docx
|
Проектирование приспособления патрон.docx
|
Резьбофрезерование.docx
|
Заключение.docx
|
Пояснилка.docx
|
Приложение.docx
|
Список использованных источников.docx
|
Титульный содержание.docx
|
|
01 МК1.frw
|
01 Опер.карта 015.frw
|
01 Опер.карта 020.frw
|
02 Опер.карта 015.frw
|
02 Опер.карта 020.frw
|
03 Опер.карта 015.frw
|
карта контроля.frw
|
карта эскизов1.frw
|
карта эскизов2.frw
|
карта эскизов3.frw
|
карта эскизов4.frw
|
КЭ контроль.frw
|
Additional information
1_list.cdw
1 Чертеж детали.cdw
10 Экономика А1.cdw
11 КИМ.cdw
2 Схват.cdw
3 Наладка1.cdw
4 Наладка2.cdw
5 РТК сбоку.cdw
6 РТК сверху.cdw
7 РТК общий.cdw
9 Циклограмма А11.cdw
Тележка.cdw
8 ЗаготовкаСверлаЭскизы.frw
Patron_pnevmaticheskii.cdw
Stol ST-150.cdw
патрон.cdw
спецификация.cdw
01 МК1.frw
01 Опер.карта 015.frw
01 Опер.карта 020.frw
02 Опер.карта 015.frw
02 Опер.карта 020.frw
03 Опер.карта 015.frw
карта контроля.frw
карта эскизов1.frw
карта эскизов2.frw
карта эскизов3.frw
карта эскизов4.frw
КЭ контроль.frw
Similar materials
- 20.09.2021
- 12.04.2024
- 24.01.2023
- 20.09.2021
- 20.09.2021