• RU
  • icon Waiting For Moderation: 11
Menu

Design of the intermediate support of the railway bridge of the beam-cutting system

  • Added: 26.06.2022
  • Size: 349 KB
  • Downloads: 0
Find out how to download this material

Description

According to the initial data, it is required to design a support for a split beam railway bridge:

1) span length:  77.0 m and 66.0 m;

2) construction area – Sosnogorsk;

3) time load – C13;

4) ice thickness – 0.6 m;

5) the level of intermediate waters UMV = 71.5 m;

6) the level of high waters of hydrocarbons = 73.3 m;

7) the level of high ice drift of the UVL = 72.8 m;

8) the level of low ice drift UNL = 71.8 m;

9) elevation of the bottom of the channel - 70.0 m;

10) elevation of the top of the sub-farms – 75.3 m

Project's Content

icon Чертежи.dwg
icon Курсач.docx

Additional information

Drawings content

icon Чертежи.dwg

Чертежи.dwg

Free downloading for today

Update after: 10 hours 24 minutes
up Up