Design of a 9-storey residential building at different levels in Orel
- Added: 13.12.2014
- Size: 2 MB
- Downloads: 0
Description
Project's Content
|
|
|
01-genplan.dwg
|
02-teo.dwg
|
03-fasad[1].dwg
|
04-fasad[2].dwg
|
05-arxra[1].dwg
|
05-magazin.dwg
|
06-arxra[2].dwg
|
07-fas+raz.dwg
|
08-fasbok.dwg
|
09-plita.dwg
|
10-rostwerk.dwg
|
11-fund.dwg
|
12-tsp-ein.dwg
|
13-tsp-zwei.dwg
|
14-strgplan.dwg
|
|
ALB.EXE
|
Alb.hlp
|
Readme.txt
|
|
album.GIF
|
PGS-min.gif
|
PGS.dwg
|
PGS.GIF
|
PGS.PNG
|
|
|
Копия 1=тэо-кон.wbk
|
Копия 1=тэо-лрв.wbk
|
Копия 1=тэо-м-1.wbk
|
Копия 1=тэо-нач.wbk
|
Копия 1=тэо-т11.wbk
|
Копия 1=тэо-т12.wbk
|
|
teplo.dwg
|
teplo1.wmf
|
teplo2.wmf
|
teplo3.wmf
|
Копия 2=арх-16.wbk
|
|
Копия 3=ркр-лкп-7.wbk
|
Копия 3=ркр-общ-2.wbk
|
Копия 3=ркр-пл-11.wbk
|
Копия 3=ркр-ф-10.wbk
|
|
oif1.wmf
|
oif2.wmf
|
oif3.wmf
|
Копия 4=оиф-9.wbk
|
Копия 4=оиф-наука-2.wbk
|
|
tsp-ein2.wmf
|
tsp-ein3.wmf
|
tsp-zwei1.wmf
|
Копия 5=тсп-26.wbk
|
Копия 5=тсп-3кон.wbk
|
|
6=итого.doc
|
DIP#0[17].doc
|
Копия 6=осп-3.wbk
|
Копия 6=осп-кон-10.wbk
|
Копия 6=осп-табсет-7.wbk
|
Копия 6=эос-1.wbk
|
Копия DIP#0-0объ.wbk
|
Копия DIP#0лр.wbk
|
Копия DIP-0[14].wbk
|
Копия DIP-0лр.wbk
|
|
01.DB
|
01.PX
|
01.X02
|
01.Y02
|
0IP#0.DB
|
0IP#0.PX
|
0IP#0.X02
|
0IP#0.Y02
|
0IP-0.DB
|
0IP-0.PX
|
0IP-0.X02
|
0IP-0.Y02
|
0var-m.DB
|
0var-m.PX
|
0var-m.X02
|
0var-m.Y02
|
0var-s.DB
|
0var-s.PX
|
0var-s.X02
|
0var-s.Y02
|
11.DB
|
11.PX
|
1IP#0.DB
|
1IP#0.PX
|
1IP-0.DB
|
1IP-0.PX
|
1var-m.DB
|
1var-m.PX
|
1var-s.DB
|
1var-s.PX
|
21.DB
|
2IP#0.DB
|
2IP-0.DB
|
2var-m.DB
|
2var-s.DB
|
D1.DB
|
d1.ini
|
D1.PX
|
DIP#0.DB
|
dip#0.ini
|
DIP#0.PX
|
DIP#0.TXT
|
DIP#0.xls
|
DIP-0.DB
|
dip-0.ini
|
DIP-0.PX
|
DIP-0.TXT
|
DIP-0.xls
|
Dvar-m-res.doc
|
Dvar-m-лок.doc
|
Dvar-m-ЛРВ.doc
|
Dvar-m.DB
|
Dvar-m.doc
|
dvar-m.ini
|
Dvar-m.PX
|
Dvar-m.WBD
|
Dvar-m.WRI
|
Dvar-s-res.doc
|
Dvar-s-ЛОК.doc
|
Dvar-s-ЛРВ.doc
|
Dvar-s.DB
|
Dvar-s.doc
|
dvar-s.ini
|
Dvar-s.PX
|
Dvar-s.WBD
|
Dvar-s.WRI
|
оба.doc
|
укруп.doc
|
|
Копия 7=бжд-1.wbk
|
Копия 7=бжд-2-свет.wbk
|
Копия 7=бжд-22.wbk
|
|
Копия Аннотация.wbk
|
Копия Введение.wbk
|
Копия ЛИТ-РА.wbk
|
Копия Содержание.wbk
|
Содержание.doc
|
Additional information
Contents
Introduction
Summary
1. Feasibility Study for Design Option Selection
1.1 General provisions
1.2 Calculation of estimated cost of construction and installation works
1.3 Calculation of capital investments for the purchase of construction equipment
1.4 Characteristics of the main design solutions
2. Architectural and construction section
2.1 General part
2.2 General characteristics of the building
2.3 Space planning solutions
2.3.1 Foundations
2.3.2 Exterior walls
2.3.3 Exterior Finishes
2.3.4. Partitions
2.3.5 Floors and coverings
2.3.6 Interior Finishes
2.3.7 Floors
2.3.8 Windows and doors
2.3.9 Kitchens
2.3.10 Bathrooms and sanitary units
2.3.11 Stairwell
2.3.12 Elevators
2.3.13 Heating
2.3.14 Water supply
2.3.15 Sewerage
2.3.16 Power supply
2.3.17 Garbage duct
2.4 Technical and economic indicators
2.5 Climatic characteristics of Orel
2.6 Heat Engineering Calculation
2.6.1 General provisions
2.6.2 Outer Wall Calculation
2.6.3 Calculation of thickness of attic insulation
2.6.4 Determination of heat absorption index of floor surface
2.7 Development Master Plan Decision
3. Design Section
3.1 Calculation of reinforced concrete strip pedestals of pile foundations
3.1.1 Calculation of reinforced concrete strip pedestals of pile foundations for external walls
Calculation of transverse rods
Calculation for push-through
3.2.1 Calculation of reinforced concrete strip pedestals of pile foundations for internal walls
3.2.2 Calculation of transverse rods
3.2.3 Calculation for push-through
3.3.1 Calculation of precast reinforced concrete march
3.3.2 Determination of loads and forces
3.3.3 Preliminary assignment of dimensions of the cross section of the march
3.3.4 Calculation of inclined section for transverse force
3.4.1. Calculation of reinforced concrete slab
3.4.2. Define Loads
3.4.3 Calculation of the plate shelf
3.4.4 Calculation of frontal edge
3.4.5 Calculation of inclined cross section of frontal rib for transverse force
3.5 Calculation of multi-stop slab
3.5.1 Calculation by limit states of the first group
3.5.2 Calculation of multi-stop plate by limit states of the second group
3.5.3 Pre-stress loss of valves
3.5.4 Calculation by crack formation,
normal to longitudinal axis
3.5.5 Calculation of plate deflection
4. Foundations and foundations
4.1 General provisions
4.2 Engineering and geological conditions of the construction site
4.3 Measures to reduce deformations due to frost straining forces
4.4 Measures for the period of operation of buildings and structures for soil protection based on excess water saturation
4.5 Technical Instructions for Construction of Pile Foundations
4.6 The solution and geo-ecological approach to the problem of the adjacent foundations are applied
5. Construction production technology
5.1 General provisions
5.2 Earthworks
5.3 Piling Procedure
5.4 Technology of erection of cast-in-situ reinforced concrete pile
5.5 Safety precautions during works
5.6 Reinforcement of cast-in-situ reinforced concrete pile
5.7 Concreting
5.8 Concrete mix supply and distribution equipment
5.9 Laying of concrete mixture
5.10 Quality control and acceptance of works
5.11 Compaction of concrete mixture
5.12 Features of concrete works at negative temperatures
5.13 Installation of wall foundation blocks
5.14 Layered masonry
5.15 Floor slabs
5.16 Installation works
5.17 Stone works
5.18 Roof
5.19 Requirements for roofing
5.20 Insulation Layer Requirements
5.21 Operational quality control of construction works
5.22 Determination of crane parameters
6. Economy and organization of construction
6.1 Determination of estimated construction cost
6.2 Determination of estimated cost in local and object estimates
7. Occupational and environmental protection
7.1 Analysis of hazardous and harmful factors
7.2 Safety features during construction
7.3 Occupational safety of excavator drivers
7.3.1 Safety requirements before starting operation
7.3.2 Safety requirements during operation
7.3.3 Safety requirements in emergency situations
7.3.4 Safety requirements upon completion of operation
7.4 Occupational safety of masons
7.4.1 Safety requirements before starting operation
7.4.2 Safety requirements during operation
7.4.3 Safety requirements in emergency situations
7.4.4 Safety requirements upon completion of operation
7.5 Ensuring fire safety
7.6 Environmental protection measures
7.7. Lighting Calculation
7.7.1. Temporary lighting
7.7.2 Calculation of searchlight of the construction site
7.7.3 Calculation of searchlight of construction area by method of light flux
7.7.4 Calculation of site searchlight by specific power method
01-genplan.dwg
02-teo.dwg
03-fasad[1].dwg
04-fasad[2].dwg
05-arxra[1].dwg
05-magazin.dwg
06-arxra[2].dwg
07-fas+raz.dwg
08-fasbok.dwg
09-plita.dwg
10-rostwerk.dwg
11-fund.dwg
12-tsp-ein.dwg
13-tsp-zwei.dwg
14-strgplan.dwg
PGS.dwg
teplo.dwg
Similar materials
- 09.07.2014
- 10.04.2022