Course project for water supply on 15 floors of an apartment building
- Added: 09.11.2019
- Size: 1 MB
- Downloads: 0
Description
Typical floor plan, axonometric diagram of water supply, sewerage, section 1-1, bathroom plan, gene site plan, explanatory note, calculations to exel,
Project's Content
|
Саратов Model (1).pdf
|
Саратов.dwg
|
93sQQtcMUQA.jpg
|
пз.docx
|
Additional information
Contents
CONTENTS
Contents
Introduction
Source Data
1. Layout selection and design of the residential water supply system
1.1.General provisions for the selection of the scheme and the design of the water supply system of a residential building
1.2 Determination of calculation costs for sections of the internal water supply network and calculation of its diameter
1.3. Design of water metering unit of water supply network at inputs to
building
1.4. Design of residential water supply system and selection of pump for water pumping plant
1.5. Selection of pump for water pumping plant
2. General Provisions for Residential Sewerage Design
2.1 Selection of the scheme and design of the drainage system of the residential building
3. Design of the yard sewerage system and layout of the residential building
3.1 Calculation of internal and yard sewers
List of literature
Introduction
The purpose of the course work is: to learn hydraulic calculation of pipelines, as well as to select schemes and design water supply, drainage and sewage systems of a residential building.
The course work shall be performed in accordance with the current construction codes and regulations (SNiP) [1,2] and the unified design documentation system (ESKD). The main methodological literature for course work is textbooks and manuals on water supply and sewerage of networks and buildings [3,4,5,6 ].
Coursework includes calculation and graphic parts. The calculation part is carried out in the form of an explanatory note with a volume of 2530 pages of handwritten text, which includes hydraulic calculations: internal water supply, internal and external drains and a sewage system.
The graphic part is executed in A1 format, where:
- plot plan of M1 section: 500;
- typical floor plan M1: 100 ;
- plan of the basement of M1:100;
- plan of sanitary-kitchen unit with sanitary devices M1: 50 ;
- axonometric diagram of M1 water supply system: 50;
- axonometric diagram of sewage along one M1 riser: 100;
- longitudinal profile of the yard sewer on the scale M1: 200 vertically and M1: 500 horizontally.
Source Data
- plot plan of residential development site M 1:500;
- standard floor plan M 1:100;
- number of floors in this building 16;
- number of consumers in building (U) 284;
- elevation of the first floor is 2.0 m;
- elevation of the ground surface near the building 1.7 m;
- ground freezing depth 0.9 m;
Piping top elevation at building entry:
- water supply 0.5m;
- sewerage 0.3m;
- room height 2.8 m;
- basement height 2.2 m;
- slab thickness 0.3 m;
Pipeline slope from inlet to inspection well:
- water supply 0.002 m;
- sewerage of 0.006 m;
Distance from red line:
-to the building 5.1 m;
- to the street water supply 4.1 m;
-to street sewage pipeline 5.6 m;
- guaranteed head 32 m.