• RU
  • icon Waiting For Moderation: 0
Menu

Course Design - Development of Job Instructions

  • Added: 09.12.2019
  • Size: 459 KB
  • Downloads: 0
Find out how to download this material

Description

The map was developed for the construction of monolithic railway foundations of one-story industrial buildings. The work is carried out in Kazan, in the summer. Number of foundations 18 pcs. The foundation is square in plan. Concrete brand M200. Reinforcement with grids ∅ reinforcement 16 mm. Weight of one grid is 1.39 t. Formwork from shields. Method of concrete mixture supply - auto concrete pump. The work includes: reinforcement works, formwork, concrete and disassembly of formwork .

Project's Content

icon proekt-1-1.dwg

Additional information

Drawings content

icon proekt-1-1.dwg

proekt-1-1.dwg

Free downloading for today

Update after: 6 hours 15 minutes
up Up