Course Design - Development of Job Instructions
- Added: 09.12.2019
- Size: 459 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The map was developed for the construction of monolithic railway foundations of one-story industrial buildings. The work is carried out in Kazan, in the summer. Number of foundations 18 pcs. The foundation is square in plan. Concrete brand M200. Reinforcement with grids ∅ reinforcement 16 mm. Weight of one grid is 1.39 t. Formwork from shields. Method of concrete mixture supply - auto concrete pump. The work includes: reinforcement works, formwork, concrete and disassembly of formwork .
Project's Content
proekt-1-1.dwg
|
Additional information
Drawings content
proekt-1-1.dwg
Similar materials
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 6 hours 15 minutes