Construction of the main inclined shaft at the Duet gold deposit
- Added: 26.12.2021
- Size: 291 KB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
In this field, after deepening the inclined shaft No. 2 and No. 3 on the horizon, where the main transshipment operations + 175 are planned. In this regard, we have considered the design of the waiting chamber for the main inclined barrel No. 3 at the level of +175.
For inclined and vertical workings that serve as exits to the surface when the difference in the markers of the end points is more than 40 m, mechanical transportation of people should be equipped.
Project's Content
Cgtwxfcnm Строительство главного наклонного ствола на золоторудном месторождении Дуэт.docx
|
Similar materials
- 01.07.2014
- 25.10.2022
Free downloading for today
Update after: 9 hours 22 minutes