• RU
  • icon Waiting For Moderation: 0
Menu

Construction of the main inclined shaft at the Duet gold deposit

  • Added: 26.12.2021
  • Size: 291 KB
  • Downloads: 1
Find out how to download this material

Description

In this field, after deepening the inclined shaft No. 2 and No. 3 on the horizon, where the main transshipment operations + 175 are planned. In this regard, we have considered the design of the waiting chamber for the main inclined barrel No. 3 at the level of +175.

For inclined and vertical workings that serve as exits to the surface when the difference in the markers of the end points is more than 40 m, mechanical transportation of people should be equipped.

Project's Content

icon Cgtwxfcnm Строительство главного наклонного ствола на золоторудном месторождении Дуэт.docx
up Up