Construction of a school for 840 people in Kuznetsk, the work of a Bachelor of PGS

  • Added: 22.10.2024
  • Size: 5 MB
  • Downloads: 0
Find out how to download this material

Description

The designed building is designed for 29 classes. The school building is 3-storey and consists of three blocks. ''Expansion joint - designed to reduce loads on structural elements in places of possible deformations that occur when air temperature fluctuates, seismic phenomena, uneven soil settlement and other influences''

The walls are designed from brick with aerated concrete insulation ( 640mm brick ''120+120=240'', ''aerated concrete blocks 400mm''), pile foundations with a monolithic reinforced concrete grillage (piles, grillage, foundation block). ''Aerated blocks do not burn, do not emit toxic substances when heated and are able to withstand exposure to an open flame for two hours without losing load-bearing capacity.''

Roofing 4-layer (4 layers of rubiroid, insulation mineral wool slabs . provide openings''.

The duration of construction according to the calendar plan is 12 months, according to the norms the duration of construction (SNiP 1.04.03-95*) is 14 months.

A self-propelled tower crane KB - 503 was selected (Load capacity, with the smallest hook reach 10t , at the maximum 7.5 tons, the lifting height of the load, at the smallest hook reach 55 m) depends on the load capacity, boom reach and hook lifting height

Dangerous area of ​​the crane (maximum boom reach + depth of load length + distance from the hook reach to the place where the load falls)

Construction cost – 132 million 816 thousand rubles

Issues of ensuring safety during the main types of construction and installation work carried out at a construction site were considered.