Concentration plant for processing ores of the Yubileynoye deposit in the Khaibullinsky district. Engineering Building - Automation

- Added: 01.07.2014
- Size: 742 KB
- Downloads: 0
Subscribe to receive an information about new materials:
Description
Complete design with automation schematic diagram, single-line cabinet diagram, external wiring diagram, electrical schematic diagram, cabinet appearance, wiring plan and equipment layout and specification with general data
Project's Content
![]() |
![]() ![]() ![]() |
Similar materials
- 25.01.2023
- 24.01.2023
- 01.07.2014
- 25.01.2023
- 24.01.2023
Free downloading for today
Update after: 25 minutes