Chemical warehouse. J. DSP area. Vankorskoye field. The project for the installation of the tank is 200 m3 in volume.
- Added: 09.07.2014
- Size: 3 MB
- Downloads: 4
Subscribe to receive an information about new materials:
Description
Project for installation of 200 m3 tank for glycol storage, oxygen extinguishing agent, corrosion inhibitor) Explanatory note. PID for tank strength testing. Process instruction for welding of tank bottom. Job Instruction for Tank Wall Welding. Job Instruction for Tank Roof Welding. Job Instruction for welding of manholes and branch pipes of the tank.
Project's Content
|
|
|
|
|
|
|
|
The material is an archive with files that can be opened in programs: