Checkpoint - ATP design

  • Added: 13.04.2023
  • Size: 977 KB
  • Downloads: 0
Find out how to download this material

Description

The initial data for the technological calculation of the motor transport enterprise are:

-list number of ASJ cars of the J-th brand (compatible group): 125 dump trucks based on KAMAZ truck - 55111, 125 dump trucks based on MAZ truck - 5551;

-average daily mileage of Lcc cars – 350 km;

-number of working days other days per year – 247 days;

-duration of work of tons of cars on the line (time in the outfit) - 8 hours;

-average mileage of a group of vehicles from the beginning of operation: for dump trucks based on a truck 0.3 to kr;

-type of road surface - reinforced soil;

- terrain - mountainous - outside the suburban zone;

-traffic conditions;

-natural and climatic conditions - hot dry.