Cargo trolley of semi-goat crane
- Added: 06.05.2020
- Size: 1 MB
- Downloads: 0
Description
Cargo trolley of a semi-goat crane with a lifting capacity of 20 T. Lifting mechanism: motor, reduction gear box, drum. Movement mechanism: Gear motor. DBE, compass drawing 16.
Project's Content
|
Теляков А.Ф. Тележка ПЗ.docx
|
тележка Теляков А.Ф. 15 компас.23 апреля.cdw
|
Additional information
Contents
Table of contents
1 Initial data
2 Design of lifting mechanism
2.1 Selection of polyspast
2.2 Rope Selection
2.3 Selection of unit and drum parameters
2.4 Engine selection
2.5 Gearbox selection
2.5 Brake selection
2.6 Selection of couplings
2.7 Check of mechanism by start-up time
3 Design calculation of trolley movement mechanism
3.1 Description of trolley movement mechanism diagram
3.2 Determination of trolley weight
3.3 Selection of running wheels
3.4 Determination of resistance to movement
3.5 Selection of gear motor
3.6 Determination of traction margin of running wheels
3.7 Check of absence of slippage during trolley operation
4. Strength calculations of lifting mechanism
4.1 Calculation of bolts of drum flange joint and toothed half-coupling
4.2 Calculation of rope attachment to drum
4.3 Calculation of drum axle bearings
4.4 Calculation of drum axis
List of literature
1 Initial data
Lifting capacity Q = 20 t.
Load lifting speed v = 12 m/min.
Lifting height of load h = 12 m.
Span length L = 40 m
3.1 Description of trolley movement mechanism diagram
We accept the movement mechanism diagram in accordance with Figure 3.1.
Movement mechanism consists of engine 2, brake 1, elastic sleeve-flange coupling 3, vertical reduction gear 4, double-rim gear coupling 5, support 6, running wheel 7.
The designed trolley is supported by four running wheels. Two wheels are driven, and two are idle. Mechanism of trolley movement is designed for its movement at specified speed both empty and with maximum load. The mechanism must also provide braking of the trolley for a certain time.
Torque of electric motor is transmitted through reduction gear to two drive wheels. Electric motor shaft is connected with high-speed shaft of reduction gear by means of bushing-flange coupling. By analogy with scheme of lifting mechanism one of its half-couplings is made in the form of brake pulley on which brake is installed. The scheme of the movement mechanism (Figure 3.1) assumes that part of the mechanism is located above the floor of the trolley, and part is located under it.
тележка Теляков А.Ф. 15 компас.23 апреля.cdw
Similar materials
Free downloading for today
Other materials
- 24.01.2023