• RU
  • icon Waiting For Moderation: 11
Menu

As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring

  • Added: 09.12.2016
  • Size: 479 KB
  • Downloads: 0
Find out how to download this material

Description

As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring

Project's Content

icon shema-14.--nastil-kryshi.dwg

Additional information

Drawings content

icon shema-14.--nastil-kryshi.dwg

shema-14.--nastil-kryshi.dwg
up Up