• RU
  • icon Waiting For Moderation: 7
Menu

As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring

Description

As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring

Project's Content

icon shema-14.--nastil-kryshi.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView

Additional information

Drawings content

icon shema-14.--nastil-kryshi.dwg

shema-14.--nastil-kryshi.dwg
up Up