As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring
- Added: 09.12.2016
- Size: 479 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring
Project's Content
shema-14.--nastil-kryshi.dwg
|
Additional information
Drawings content
shema-14.--nastil-kryshi.dwg
Similar materials
- 09.12.2016
- 09.12.2016
- 23.10.2023
- 22.11.2020
- 18.05.2015
Free downloading for today
Update after: 4 hours 5 minutes
- 20.08.2014