As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring
Description
As-built diagram of welding connections of the post-operation inspection log during construction of a vertical cylindrical tank, roof flooring
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Additional information
Drawings content
shema-14.--nastil-kryshi.dwg
Similar materials
- 09.12.2016
- 09.12.2016
- 23.10.2023
- 22.11.2020
Free downloading for today
Update after: 13 hours 38 minutes