As-built diagram of welding connections of the post-operation control log during construction of a vertical cylindrical tank, hatch and branch pipes in the flooring
- Added: 09.12.2016
- Size: 77 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
As-built diagram of welding connections of the post-operation control log during construction of a vertical cylindrical tank, hatch and branch pipes in the flooring
Project's Content
shema-15.-shema-svarnyh-soedineniy-lyukov-nastile-kryshi.dwg
|
Additional information
Drawings content
shema-15.-shema-svarnyh-soedineniy-lyukov-nastile-kryshi.dwg
Similar materials
- 09.12.2016
- 09.12.2016
- 23.10.2023
- 07.04.2022
- 25.12.2020
- 04.11.2022
Free downloading for today
Update after: 51 minutes
Other materials
- 24.01.2023