Apartment building with service facilities west of the Ainabulak-2 microdistrict
- Added: 01.07.2014
- Size: 2 MB
- Downloads: 0
Description
Project's Content
|
1,2.dwg
|
3. Колонна и лестничный марш,.dwg
|
4 Календарный график.dwg
|
5 Календарный план.dwg
|
6 Генплан.dwg
|
7 Стройгенплан.dwg
|
Содержание.doc
|
Additional information
Contents
I. Architectural and construction section
1.1 Initial data _______________________________________________
1.2 General Plan _______________________________________________________
1.3 Volume-planning solution of the building. _________________________
1.4 Constructive solution ________________________________________
1.5 Heat engineering calculation of the external wall of the building. _________________
1.5.1 Solution ____________________________________________________
1.6 Thermal calculation of the building coating _______________________
1.6.1 Solution ____________________________________________________
1.7 Determination of foundation depth ____________________
1.8 Specification of filling of window and door openings ____________
1.9 Floor Explication _____________________________________________
1.10 Exterior and interior decoration of the building. _________________________
1.11 Measures to protect load-bearing structures of the building from corrosion. _
1.12 Engineering equipment. ______________________________________
1.13 Antiseismic measures. ________________________________
II. Design Section
2.1 Load collection for 1m2 coatings __________________________________
2.2 Load collection for 1m2 floors ________________________________
2.3 Calculation of the middle row column ___________________________________
2.4 ________________________________________________ Plan Fragment
2.5 Collection of load on the column _______________________________________
2.6 Calculation and design of stairway of slab structure _______________________________________________________________
2.7 Ladder march LM1 _________________________________________
III. Technology and Construction Management
3.1 Formwork ___________________________________________
3.1.1 Formwork types _____________________________________________
3.1.2 Formwork of columns _____________________________________________
3.1.3 Formwork of stiffening diaphragms _________________________________
3.1.4 Formwork of floors _________________________________________
3.1.5 Expansion of structures _________________________________
3.1.6 Safety precautions _________________________________________
3.2 Reinforcement works ____________________________________________
3.2.1 Installation of valves ________________________________________
3.3 Concrete works ______________________________________________
3.3.1 Concreting of walls and columns ________________________________
3.3.2 Concreting of stiffening diaphragms. ____________________________
3.3.3 Concreting of slabs. ___________________________________
3.3.4 Acceptance of concrete and reinforced concrete structures or parts of structures. ___________________________________________________________
3.3.5 Concrete care. ______________________________________________
3.4 Definition of scope of work. _____________________________________
3.5 Select the installation crane. ____________________________________
3.6 Determination of replaceable capacity of the crane _________________
3.7 Determination of estimated machine cost per hour ________________
3.8 Determination of labor intensity of works per unit of volume measurement _____
3.9 TEP of the crane _____________________________________________________
3.10 Definition of vehicle requirements _________________
3.11 List of requirements for basic materials and structures ___
3.12 Calculation of the composition of the integrated brigade ____________________________
3.13 Innovative technologies. ____________________________________
IV. Economic section
4.1 Introduction of ______________________________________________________
4.2 Summary estimate of _______________________________________
4.3 Object estimate. _______________________________________________
4.4 Local estimate No. 1 ____________________________________________
4.5 Local estimate No. 2 ____________________________________________
4.6 Local estimate No. 3 ____________________________________________
4.7 Technical and economic indicators of the project. ______________________
4.8 Operational and production plan of the master's site ______________
V. Occupational safety in construction
5.1 General Occupational Safety Requirements, ______________________________
5.2 Safety requirements before start of operation/ __________________
5.3. Safety in earthworks. _____________________
5.4. Safety precautions during formwork __________________
5.5. Safety Rules for Concrete Works/ _____________
5.6. Safety precautions for molar works _____________________
5.7. Safety and Fire Safety Measures _
5.8. General Occupational Safety Requirements, ______________________________
List of used literature
1,2.dwg
3. Колонна и лестничный марш,.dwg
4 Календарный график.dwg
5 Календарный план.dwg
6 Генплан.dwg
7 Стройгенплан.dwg
Similar materials
- 09.08.2014
- 04.11.2022
- 01.07.2014
Free downloading for today
- 21.04.2016