• RU
  • icon Waiting For Moderation: 0
Menu

Apartment building with service facilities west of the Ainabulak-2 microdistrict

  • Added: 01.07.2014
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

Graphic part of diploma project-8 sheets

Project's Content

icon
icon 1,2.dwg
icon 3. Колонна и лестничный марш,.dwg
icon 4 Календарный график.dwg
icon 5 Календарный план.dwg
icon 6 Генплан.dwg
icon 7 Стройгенплан.dwg
icon Содержание.doc

Additional information

Contents

I. Architectural and construction section

1.1 Initial data _______________________________________________

1.2 General Plan _______________________________________________________

1.3 Volume-planning solution of the building. _________________________

1.4 Constructive solution ________________________________________

1.5 Heat engineering calculation of the external wall of the building. _________________

1.5.1 Solution ____________________________________________________

1.6 Thermal calculation of the building coating _______________________

1.6.1 Solution ____________________________________________________

1.7 Determination of foundation depth ____________________

1.8 Specification of filling of window and door openings ____________

1.9 Floor Explication _____________________________________________

1.10 Exterior and interior decoration of the building. _________________________

1.11 Measures to protect load-bearing structures of the building from corrosion. _

1.12 Engineering equipment. ______________________________________

1.13 Antiseismic measures. ________________________________

II. Design Section

2.1 Load collection for 1m2 coatings __________________________________

2.2 Load collection for 1m2 floors ________________________________

2.3 Calculation of the middle row column ___________________________________

2.4 ________________________________________________ Plan Fragment

2.5 Collection of load on the column _______________________________________

2.6 Calculation and design of stairway of slab structure _______________________________________________________________

2.7 Ladder march LM1 _________________________________________

III. Technology and Construction Management

3.1 Formwork ___________________________________________

3.1.1 Formwork types _____________________________________________

3.1.2 Formwork of columns _____________________________________________

3.1.3 Formwork of stiffening diaphragms _________________________________

3.1.4 Formwork of floors _________________________________________

3.1.5 Expansion of structures _________________________________

3.1.6 Safety precautions _________________________________________

3.2 Reinforcement works ____________________________________________

3.2.1 Installation of valves ________________________________________

3.3 Concrete works ______________________________________________

3.3.1 Concreting of walls and columns ________________________________

3.3.2 Concreting of stiffening diaphragms. ____________________________

3.3.3 Concreting of slabs. ___________________________________

3.3.4 Acceptance of concrete and reinforced concrete structures or parts of structures. ___________________________________________________________

3.3.5 Concrete care. ______________________________________________

3.4 Definition of scope of work. _____________________________________

3.5 Select the installation crane. ____________________________________

3.6 Determination of replaceable capacity of the crane _________________

3.7 Determination of estimated machine cost per hour ________________

3.8 Determination of labor intensity of works per unit of volume measurement _____

3.9 TEP of the crane _____________________________________________________

3.10 Definition of vehicle requirements _________________

3.11 List of requirements for basic materials and structures ___

3.12 Calculation of the composition of the integrated brigade ____________________________

3.13 Innovative technologies. ____________________________________

IV. Economic section

4.1 Introduction of ______________________________________________________

4.2 Summary estimate of _______________________________________

4.3 Object estimate. _______________________________________________

4.4 Local estimate No. 1 ____________________________________________

4.5 Local estimate No. 2 ____________________________________________

4.6 Local estimate No. 3 ____________________________________________

4.7 Technical and economic indicators of the project. ______________________

4.8 Operational and production plan of the master's site ______________

V. Occupational safety in construction

5.1 General Occupational Safety Requirements, ______________________________

5.2 Safety requirements before start of operation/ __________________

5.3. Safety in earthworks. _____________________

5.4. Safety precautions during formwork __________________

5.5. Safety Rules for Concrete Works/ _____________

5.6. Safety precautions for molar works _____________________

5.7. Safety and Fire Safety Measures _

5.8. General Occupational Safety Requirements, ______________________________

List of used literature

Drawings content

icon 1,2.dwg

1,2.dwg

icon 3. Колонна и лестничный марш,.dwg

3. Колонна и лестничный марш,.dwg

icon 4 Календарный график.dwg

4 Календарный график.dwg

icon 5 Календарный план.dwg

5 Календарный план.dwg

icon 6 Генплан.dwg

6 Генплан.dwg

icon 7 Стройгенплан.dwg

7 Стройгенплан.dwg

Free downloading for today

Update after: 17 hours 39 minutes
up Up