• RU
  • icon Waiting For Moderation: 0
Menu

AC traction substation with the development of an individual part of the project "Criteria for choosing a TSN in parallel operation"

  • Added: 16.04.2023
  • Size: 4 MB
  • Downloads: 0
Find out how to download this material

Description

The purpose of the thesis is the development of an alternating current traction substation. When developing, one should be guided by the Rules for Electrical Installations (PUE), technological design standards, regulatory documents, as well as reference literature.

The work involves the development of a diagram of the main electrical connections of the substation, the calculation of short-circuit currents and maximum currents and the selection of the main power equipment of the substation - switches, disconnectors, current transformers, voltage transformers

Project's Content

icon 7. Разрезы ПС.vsd
icon 4.Пояснительная записка.docx
icon 3. Содержание.docx
icon 6. План ПС.vsd
icon 5. Однолинейная схема ПС.vsd
up Up