AC traction substation with the development of an individual part of the project "Criteria for choosing a TSN in parallel operation"
- Added: 16.04.2023
- Size: 4 MB
- Downloads: 0
Subscribe to receive an information about new materials:
Description
The purpose of the thesis is the development of an alternating current traction substation. When developing, one should be guided by the Rules for Electrical Installations (PUE), technological design standards, regulatory documents, as well as reference literature.
The work involves the development of a diagram of the main electrical connections of the substation, the calculation of short-circuit currents and maximum currents and the selection of the main power equipment of the substation - switches, disconnectors, current transformers, voltage transformers
Project's Content
|
|
|
|
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- Visio
- Microsoft Word
Similar materials
- 20.04.2022
- 11.05.2022
- 25.01.2023
- 09.07.2014
Free downloading for today
Update after: 13 hours 43 minutes