• RU
  • icon Waiting For Moderation: 0
Menu

TTK K-4-21-3. Installation of intermediate reinforced concrete supports PB 500-5N and PB 500-7N by K-162 automobile crane with 16 m boom and T-100M tractor - typical Job Instruction

  • Added: 24.04.2014
  • Size: 330 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 486.rtf
up Up