• RU
  • icon Waiting For Moderation: 0
Menu

TTK K-4-21-2. Assembly of intermediate reinforced concrete supports PB 330-7N, PB 500-5N, PB 500-7N - typical Job Instruction

  • Added: 24.04.2014
  • Size: 149 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 485.rtf
up Up