• RU
  • icon Waiting For Moderation: 28
Menu

TTK III-1.4. Construction of 330 kV RP tire reinforced concrete portal installed in drilled pits - typical Job Instruction

  • Added: 24.04.2014
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 445.rtf
up Up