SCZ/ZCS (VTS) Motorways 3 18 Execution in pit. Foundation drawing
- Added: 29.04.2016
- Size: 91 KB
- Downloads: 2
Description
Autoveses. Foundation installation drawing. Scales are used to determine the weight of the overall car
Project's Content
|
|
The material is a file that can be opened in program:
- Kompas or KOMPAS-3D Viewer (version v16 or newer)
Additional information
Drawings content
chertezh1-1.cdw
Similar materials
- 24.04.2014
- 14.06.2022
- 24.01.2023
Free downloading for today
Update after: 11 hours 55 minutes
Other materials
- 24.01.2023