• RU
  • icon Waiting For Moderation: 20
Menu

Scheme of unloading pipes from gondola cars and laying them on a whipping truck. Stacking of pipes at the work site

  • Added: 20.06.2023
  • Size: 903 KB
  • Downloads: 0
Find out how to download this material

Description

The drawings show a diagram of unloading pipes from gondola cars and laying them on a whipper. Stacking of pipes at the work site

Project's Content

icon ЛР4 СИР-Лист1.pdf
icon ЛР4 СИР.dwg

Free downloading for today

Update after: 15 hours 15 minutes
up Up