Overhaul flow chart with replacement of insulation coating and restoration of pipe wall bearing capacity
- Added: 25.05.2021
- Size: 235 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Overhaul flow chart with replacement of insulation coating and
restoring the bearing capacity of the pipe wall without lifting or
partially opened pipeline and laying it on sunbeds on trench brow
Project's Content
Чертеж 1q.cdw
|
Additional information
Drawings content
Чертеж 1q.cdw
Similar materials
- 25.05.2021
- 24.04.2014
- 24.04.2014
- 06.04.2024
- 24.04.2014
Free downloading for today
Update after: 20 hours 15 minutes