Overhaul flow chart with replacement of insulation coating and restoration of pipe wall bearing capacity

- Added: 25.05.2021
- Size: 235 KB
- Downloads: 0
Get free access by adding your material or get a discount by paying for multiple materials at once
Subscribe to receive an information about new materials:
Description
Overhaul flow chart with replacement of insulation coating and
restoring the bearing capacity of the pipe wall without lifting or
partially opened pipeline and laying it on sunbeds on trench brow
Project's Content
![]() ![]() ![]() ![]() |
Additional information
Drawings content
Чертеж 1q.cdw

Similar materials
- 25.05.2021
- 24.04.2014
- 24.04.2014
- 06.04.2024
- 24.04.2014
Free downloading for today
Update after: 19 hours 29 minutes