• RU
  • icon Waiting For Moderation: 9
Menu

Overhaul flow chart with replacement of insulation coating and restoration of pipe wall bearing capacity

  • Added: 25.05.2021
  • Size: 235 KB
  • Downloads: 0
Find out how to download this material

Description

Overhaul flow chart with replacement of insulation coating and

restoring the bearing capacity of the pipe wall without lifting or

partially opened pipeline and laying it on sunbeds on trench brow

Project's Content

icon Чертеж 1q.cdw

Additional information

Drawings content

icon Чертеж 1q.cdw

Чертеж 1q.cdw
up Up