Multi-storey residential building construction schedule
- Added: 13.05.2014
- Size: 180 KB
- Downloads: 10
Description
The designed object is a residential apartment building. The height of the building is 14 floors plus a technical floor. The two lower basements must be designed as a parking lot for residents' cars. The structural system of the building is framed. The structural framework of the building is made of monolithic concrete in building conditions One drawing.
Project's Content
|
|
|
|
Similar materials
- 26.09.2022
- 04.11.2022
- 29.07.2014
- 20.06.2017
Free downloading for today
Update after: 8 hours 13 minutes